BC58 Battery Cabinet Installation, Operation, & Maintenance
When installing this power system, follow all applicable federal, state and local regulations as well as industry guidelines to insure proper system installation.
When installing this power system, follow all applicable federal, state and local regulations as well as industry guidelines to insure proper system installation.
For detailed installation, operating, maintenance and troubleshooting information visit the Liebert ITA2 product page for the Liebert ITA2 Battery Cabinet Installer/User Guide available at
The information in this manual is provided as a guide for installation, operation, and maintenance. It does not affect or exceed our obligations under the Terms and Conditions of Sale.
Before installing batteries into the cabinet, carefully remove all items from inside the cabinet and lay it on its back, preferably on a clean surface or a furniture blanket.
Read this section and review the system drawing thoroughly before attempting to install wiring to the cabinet. Be sure that the cabinet is not connected to any AC utility power before installing any wiring
1) The document provides installation instructions for a 2.2m Battery Cabinet LiFeO4, including required tools, installation space requirements, and electrical connection safety precautions.
Prepare the surface on which the cabinet is to be placed. Assure the surface is clean, flat, and capable of supporting the weight of the cabinet battery system.
1.TO HELP PREVENT DAMAGE, ALL PANELS FROM ALL BATTERY CABINETS SHOULD BE LABELED TO THEIR PROSPECTIVE CABINET, REMOVED AND PUT ASIDE IN A SAFE
The 14050 Battery Cabinet is used for mounting a sealed cell type of battery set remote from the Fire Alarm System Control Unit.
Step 3: Measure from Top Line to Top of Battery Cabinet Bracket NOTE: All three brackets will be at different heights upon completion.
PDF version includes complete article with source references. Suitable for printing and offline reading.